Church Pentescostal " The Ark of Lord" |
|
|
|
|
|
Institution dedicated to religious services. |
|
|
Building Management System |
|
- |
The function of the Maximun III and Maximun II installed on the system are |
|
|
to enable control and monitoring of temperature, ventilation, CO2 levels, |
|
|
and general mechanical services; monitoring and logging of power and gas |
|
|
consumption. Additional features include an optimum start funtion, and |
|
|
monitoring of alarms and faults. |
|
- |
One PC, is programmed with LabView software, allow the system to be monitored |
|
|
and adjusted . |
|
|
In order to keep electricity cost down, it was necessary to ensure that |
|
|
air conditioners do not run for long continuous periods, or during periods |
|
|
when air conditioning is unnecessary. To fulfil this requirement, the |
|
|
Innotech m icrocontroller was programmed to run for timed periods only. |
|
|
In order to prevent the people from easily tampering with the internal |
|
|
settings of each controller, the microcontroller requieres a seven-second |
|
|
dual button press in order to access the programming mode. |
|
- |
It integrates a system of lighting control for energy saving lighting and dedicated |
|
|
to the intelligent control using ballast light intensity and make the place more |
|
|
confortable depending on the enviroment you want. |
|
- |
To make more efficient communication system are installed centralized |
|
|
telephones. |
|